Major repair of the boiler house with replacement of boilers with modern in Ozerska school of I-III stages of the Vladimiretsk district Council.
Boiler house with two modern energy-saving biomass boilers "KALVIS-100". The installed heat capacity of the boiler house is 200 kW.
Major repairs of the boiler house were carried out with the co-financing of the UN Development Program in Ukraine.
Main technical and economic indicators of the working project
№ n/a |
Indicator | Remark | ||
Title | Unit of measure | Numerical value | ||
1 |
Installed heat capacity |
kW |
200 |
|
|
|
Gcal/hour |
0,172 |
|
2 |
Heating capacity of the boiler room |
|
|
|
2.1 |
hour |
kW |
184,000 |
|
Gcal/hour |
0,158 |
|
||
t/hour |
7,91 |
|
||
2.2 |
annual |
thousand MJ |
3036,4 |
When the operating mode is set |
Gcal |
725,2 |
|||
3 |
Fuel consumption |
|
|
|
3.1 |
natural |
|
|
|
3.1.1 |
hour |
kg |
56,5 |
|
3.1.2 |
annual |
t. u. p. |
122,9 |
|
3.2 |
conditional |
|
|
|
3.2.1 |
hour |
t. u. p. |
28,3 |
|
3.2.2 |
annual |
t. u. p. |
61,43 |
|
4 |
Specific consumption of conventional fuel |
kg.u. p/Gcal |
178,57 |
|
5 |
Installed capacity of electric consumers in the boiler house |
kW |
2,35 |
|
6 |
The consumption of electric energy |
|
|
|
6.1 |
sentry |
kW*час |
1,95 |
|
6.2 |
annual |
thousand kW*hour |
8,9 |
|
7 |
Specific consumption of electric energy |
kW*Gcal |
26,0 |
|
8 |
Water consumption for own needs |
m3 |
7,8 |
|
8.1 |
Specific water consumption |
m3/Gcal |
4,33 |
|
9.1 |
Estimated amount of capital investment in the project volume, total |
thousand UAH |
299,653 |
|
9.2 |
including the cost of the CMR |
thousand UAH |
164,250 |
|
9.3 |
including the cost of equipment and furniture and inventory |
thousand UAH |
68,744 |
|
9.4 |
including the cost of other work and expenses |
thousand UAH |
66,658 |
Including VAT |
10 |
Estimated labor intensity of the CMR |
thousand people*hour |
2,999 |
|
11 |
Standard duration of the CMR |
months |
3 |
|