Major repair of the boiler house with replacement of boilers with modern in Ozerska school of I-III stages of the Vladimiretsk district Council.

Boiler house with two modern energy-saving biomass boilers "KALVIS-100". The installed heat capacity of the boiler house is 200 kW.
Major repairs of the boiler house were carried out with the co-financing of the UN Development Program in Ukraine.

Main technical and economic indicators of the working project


n/a
Indicator Remark
Title Unit of measure Numerical value

1

Installed heat capacity

kW

200

 

 

 

Gcal/hour

0,172

 

2

Heating capacity of the boiler room

 

 

2.1

hour

kW

184,000

 

Gcal/hour

0,158

 

t/hour

7,91

 

2.2

annual

thousand MJ

3036,4

When the operating mode is set

Gcal

725,2

3

Fuel consumption

 

 

 

3.1

natural

 

 

 

3.1.1

hour

kg

56,5

3.1.2

annual

t. u. p.

122,9

3.2

conditional

 

 

 

3.2.1

hour

t. u. p.

28,3

 

3.2.2

annual

t. u. p.

61,43

 

4

Specific consumption of conventional fuel

kg.u. p/Gcal

178,57

 

5

Installed capacity of electric consumers in the boiler house

kW

2,35

 

6

The consumption of electric energy

 

 

 

6.1

sentry

kW*час

1,95

 

6.2

annual

thousand kW*hour

8,9

 

7

Specific consumption of electric energy

kW*Gcal

26,0

 

8

Water consumption for own needs

m3

7,8

 

8.1

Specific water consumption

m3/Gcal

4,33

 

9.1

Estimated amount of capital investment in the project volume, total

thousand UAH

299,653

 

9.2

including the cost of the CMR

thousand UAH

164,250

 

9.3

including the cost of equipment and furniture and inventory

thousand UAH

68,744

 

9.4

including the cost of other work and expenses

thousand UAH

66,658

Including VAT

10

Estimated labor intensity of the CMR

thousand people*hour

2,999

 

11

Standard duration of the CMR

months

3

 

РАБОЧИЙ ПРОЕКТ

План

ФАСАДЫ

ЗАКЛЮЧЕНИЯ

COMPOSITION OF THE WORKING PROJECT PLAN FACADES CONCLUSIONS