The reconstruction of the building of the consumer goods shop at 12 Fabrichna Str. in Rivne for a boiler house with an installed heat capacity of 10.0 tons of steam per hour
The boiler room automation system provides for operation without permanent maintenance personnel.
The project includes reconstruction of the building of shop of consumer goods in the premises of the technological boiler with a year-round cycle of work with supply of all kinds of heat consumption of the single fluid - saturated steam with pressure of 1.0 MPa and a temperature of 174.5оС.
To cover the calculated heat loads, the working project provides for the installation of two TNS 50/10 steam boilers produced by the "Czech boiler plant". The boilers are supplied with an integrated water-tube steel economizer, a G11/2-A Weishaupt mounted gas burner with smooth power control, automation and safety systems, shut-off, control and safety valves, within the scope of the boiler delivery. All equipment is certified in Ukraine and has permits for use by the state supervision of labor, Gosgorpromnadzor.
Main technical and economic indicators of the working project
№ n/a |
Indicator |
Remark |
||
Title |
Unit of measure |
Numerical value |
||
1 |
Installed heat capacity |
kW |
6740 |
|
|
|
Gcal/hour |
5,62 |
|
2 |
Heating capacity of the boiler room |
|
|
|
2.1 |
hour |
kW |
3370 |
|
Gcal/hour |
2,81 |
|
||
t/hour |
5,0 |
|
||
2.2 |
annual |
ths.MJ |
133200 |
When the operating mode is set |
Гкал |
31825,0 |
|||
3 |
Fuel consumption |
|
|
|
3.1 |
natural |
|
|
|
3.1.1 |
hour |
n.m3 |
740,0 |
|
3.1.2 |
annual |
tih.n.m3 |
4205,77 |
|
3.2 |
conditional |
|
|
|
3.2.1 |
hour |
t. u. p. |
851,0 |
|
3.2.2 |
annual |
т.у.п. |
4836,63 |
|
4 |
Specific consumption of conventional fuel |
kg.u. p/Gcal |
151,98 |
|
5 |
Installed capacity of electric consumers in the boiler house |
kW |
100,0 |
|
6 |
The consumption of electric energy |
|
|
|
6.1 |
sentry |
kW*h |
29,0 |
|
6.2 |
annual |
ths.kW*h |
125,3 |
|
7 |
Specific consumption of electric energy |
kW*Gcal |
3,94 |
|
8 |
Water consumption for own needs |
м3 |
48590 |
Annual Кw= 0,5 |
8.1 |
Specific water consumption |
m3/Gcal |
1,53 |
|
9.1 |
Estimated amount of capital investment in the project volume, total |
thousand UAH |
7 274,615 |
|
9.2 |
including the cost of the CMR |
thousand UAH |
2 485,507 |
|
9.3 |
including the cost of equipment and furniture and inventory |
thousand UAH |
3 241,811 |
|
9.4 |
including the cost of other work and expenses |
thousand UAH |
1 547,297 |
Including VAT |
10 |
Estimated labor intensity of the CMR |
thousand people*hour |
28,673 |
|
11 |
Standard duration of the CMR |
months |
8 |
|