The reconstruction of the building of the consumer goods shop at 12 Fabrichna Str. in Rivne for a boiler house with an installed heat capacity of 10.0 tons of steam per hour

The boiler room automation system provides for operation without permanent maintenance personnel.

 

The project includes reconstruction of the building of shop of consumer goods in the premises of the technological boiler with a year-round cycle of work with supply of all kinds of heat consumption of the single fluid - saturated steam with pressure of 1.0 MPa and a temperature of 174.5оС.

 

To cover the calculated heat loads, the working project provides for the installation of two TNS 50/10 steam boilers produced by the "Czech boiler plant". The boilers are supplied with an integrated water-tube steel economizer, a G11/2-A Weishaupt mounted gas burner with smooth power control, automation and safety systems, shut-off, control and safety valves, within the scope of the boiler delivery. All equipment is certified in Ukraine and has permits for use by the state supervision of labor, Gosgorpromnadzor.

Main technical and economic indicators of the working project

n/a

Indicator

Remark

Title

Unit of measure

Numerical value

1

Installed heat capacity

kW

6740

 

 

 

Gcal/hour

5,62

 

2

Heating capacity of the boiler room

 

 

 

2.1

hour

kW

3370

 

Gcal/hour

2,81

 

t/hour

5,0

 

2.2

annual

ths.MJ

133200

When the operating mode is set

Гкал

31825,0

3

Fuel consumption

 

 

 

3.1

natural

 

 

 

3.1.1

hour

n.m3

740,0

3.1.2

annual

tih.n.m3

4205,77

3.2

conditional

 

 

 

3.2.1

hour

t. u. p.

851,0

 

3.2.2

annual

т.у.п.

4836,63

 

4

Specific consumption of conventional fuel

kg.u. p/Gcal

151,98

 

5

Installed capacity of electric consumers in the boiler house

kW

100,0

 

6

The consumption of electric energy

 

 

 

6.1

sentry

kW*h

29,0

 

6.2

annual

ths.kW*h

125,3

 

7

Specific consumption of electric energy

kW*Gcal

3,94

 

8

Water consumption for own needs

м3

48590

Annual Кw= 0,5

8.1

Specific water consumption

m3/Gcal

1,53

 

9.1

Estimated amount of capital investment in the project volume, total

thousand UAH

7 274,615

 

9.2

including the cost of the CMR

thousand UAH

2 485,507

 

9.3

including the cost of equipment and furniture and inventory

thousand UAH

3 241,811

 

9.4

including the cost of other work and expenses

thousand UAH

1 547,297

Including VAT

10

Estimated labor intensity of the CMR

thousand people*hour

28,673

 

11

Standard duration of the CMR

months

8

 


РАБОЧИЙ ПРОЕКТ

Реконструкция здания цеха ширпотреба по ул. Фабричной, 12 в г. Ровно (паропроизводительностью 10,0 т / час)

Реконструкция здания цеха ширпотреба по ул. Фабричной, 12 в г. Ровно (паропроизводительностью 10,0 т / час)

ЗАКЛЮЧЕНИЯ

COMPOSITION OF THE WORKING PROJECT FACADES CONCLUSIONS

foto1

foto2

foto3

foto4